| . computer room, computer rooms, comms room, comms rooms, FM200, fire protection, raised floors, raised floor, clean rooms, desk sockets, cabl. computer room, computer rooms, comms room, comms rooms, FM200, fire protection, raised floors, raised floor, clean rooms, desk sockets, cable management, computer relocation, it moves, cat5, cat 5, cat6, cat 6, cat 5e, cat5e,10g, network cabling, networkcabling, structured cabling, networks, data networks, data boxes, 4 gang sockets, 6 gang sockets, 607, section 607,bs 3696,close control air conditioning, comms cabs, comms cabinets, pdu, clean boards, water detection, leak detection, UPS, chloride, Max modules, Siemon, Cat 7, cat7, Networking solutions, netbotz, audio visual, Wiltshire and quick, giga port, patch panels, patch leads, Chatsworth products, desk units, desk sockets, sealed rooms, computerroom, commsrooms, computer room design, design and build, designandbuild, fit out, racking, furniture, office furniture, power distribution, power distribution unit, multi gang socket, av, ITT, cable basket, Wieland, patch panels, down flow, up flow, audio visual, design and build e management, computer relocation, it moves, cat5, cat 5, cat6, cat 6, cat 5e, cat5e,10g, network cabling, networkcabling, structured cabling, networks, data networks, data boxes, 4 gang sockets, 6 gang sockets, 607, section 607,bs 3696,close control air conditioning, comms cabs, comms cabinets, pdu, clean boards, water detection, leak detection, UPS, chloride, Max modules, Siemon, Cat 7, cat7, Networking solutions, netbotz, audio visual, Wiltshire and quick, giga port, patch panels, patch leads, Chatsworth products, desk units, desk sockets, sealed rooms, computerroom, commsrooms, computer room design, design and build, designandbuild, fit out, racking, furniture, office furniture, power distribution, power distribution unit, multi gang socket, av, ITT, cable basket, Wieland, patch panels, down flow, up flow, audio visual, design and build |

Case Studies
Installation of 7000 Siemon Cat 6 network points to their London HQ.
Design and build of AOL HQ data center
Smartodds
Installation of 500 10G Siemon Zmax outlets for running video over IP network
This month we have refitted out Bebo's new london headquarter, which included power, data, new stud partitioning, desk power and their office relocations
Relocation of the banks dealer staff and back office staff to tower bridge
Refurbishment of kitchen area at one of their offices
I
